
New TopShim run:

version = topshim 2.4.0
date = 2024-10-10
time = 18:07:06.342
command = topshim  convcomp tuneaxyz

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 2.8 Hz, Target= 1.0 Hz, After= 1.3 Hz
Iteration  2: FWHM Before= 1.3 Hz, Target= 0.4 Hz, After= 1.0 Hz
Iteration  3: FWHM Before= 1.0 Hz, Target= 0.5 Hz, After= 1.1 Hz
Iteration  4: FWHM Before= 1.1 Hz, Target= 0.9 Hz, After= 1.0 Hz
Iteration  5: FWHM Before= 1.0 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration  6: FWHM Before= 0.8 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration  7: FWHM Before= 0.8 Hz, Target= 0.4 Hz, After= 1.2 Hz
Iteration  8: FWHM Before= 1.2 Hz, Target= 0.9 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.36


Performing tune after shimming
tune lock level increase = 1.1

shim changes: 
Z	-3
Z2	-73
Z3	+47
Z4	-240
Z5	+284
X	+65
Y	+130

duration = 3 min 31 sec
completed successfully
finished Thu Oct 10 18:10:35 2024


========================================================================
